Suspended Ceilings

A Complete New-build Interior Fit Out for Wilsmore Physiotherapy, Plympton, Plymouth

A Complete New-build Interior Fit Out for Wilsmore Physiotherapy, Plympton, Plymouth

Our Interior Fit Out Contractors completed a complete refurbishment of a new-build industrial unit in Plympton including new Walls, Suspended Ceilings and Finishing throughout.

The challenge was to take a brand new, purpose-built industrial unit, which was effectively just a shell with a staircase leading to the 1st floor, and create general practice rooms, a kitchen, toilet, shower room, and a fitness suite on the ground-floor for rehabilitation. The building was cold, with no insulation within the walls. The client was passionate about his new business, and knew exactly what he wanted. He had drawings designed, which we helped towards finalising the finished space. The client had a budget which we had to stick to, and we came in exactly as we said we would! Understanding our clients’ needs and requirements is an essential part of what we do.

read more
Refurbishment of The Greenhouse, Chelson Meadow, Plymouth

Refurbishment of The Greenhouse, Chelson Meadow, Plymouth

STED Interiors completed ‘The Greenhouse’ over a 5-month period, and completed every aspect of the new office space interior fit out, including Suspended Ceilings, Office Partitions, Glazed Partitions, Painting & Decorating, Plastering, Carpets and Flooring, Showers & Bathrooms, Kitchens, Windows and Carpentry. 

We worked alongside SWH (South West Highways) & PCC (Plymouth City Council) to transform a run-down, open-plan office space into a state-of-the-art modern space. They wanted the area to include separate offices, to be used for meetings and private conversations, whilst still retaining the open plan area for the large viewing screens. The building had a domed ceiling, so we needed to overcome the challenge of how to hang our Suspended Ceilings and fix our Partitions. In addition to this, having a large ceiling void meant that there could be a problem with controlling the room temperature, and also with the noise from the rain water hitting the building’s tin roof. The room was very cold, as the existing ‘tin’ perimeter walls had no form of insulation to help keep the warmth in. The office is manned 24 hours a day, 365 days a year, so a fully-functioning kitchen and shower room was required, both upstairs and downstairs – as the existing kitchens were old and tired. The carpets throughout the building were old and worn, and had been there since the building was built, back in the late 80’s.

read more
Extension & Refurbishment of the A&E Department at Derriford Hospital, Plymouth

Extension & Refurbishment of the A&E Department at Derriford Hospital, Plymouth

Internal fit out of existing ward areas, new partitions and suspended ceilings in A&E Derriford Hospital in Plymouth.

Working as a sub-contractor to Nevada Construction, STED Interiors was asked to create new wards and bed spaces, plus new arrangements to corridor areas. The hospital was not able to close the existing A&E Department, so the whole project had to be completed delicately, in an occupied, fully functioning hospital with real people and patients! Care had to be taken every step of the way, with everything from noise to deliveries having to be considered from the very start.

read more